Move to the text
A higher technique.
As for the infrastructure maintenance, a high technique is found. In addition, the efficient way having higher precision is demanded from a conventional method. I push forward introduction and the technology development of the new technology on hardware, soft both sides to meet such needs.
 
"Hero as for us"
A project start!
A cool figure active every day
Please see
Of the Bridge inspection
As a professional
 
As for the submissions of work, the minute data on the short deadline,
I ascertain the thing which the customer buys,
I can meet every needs
I build the system.
Plan, suggestion of the Three-dimensional measurement
I cope until the modeling of measurement data let alone field measurement.
Sale, the rental of 3D laser scanner and the data handling software is negotiable.
What is Bridge inspection?
I carried out the Bridge inspection from the opening of business of 1997 and was engaged in various inspection, investigations. I repeat MLIT, the Metropolitan expressway, NEXCO, the a great variety of inspection results including JR.
Your eyes,
By security, I keep life.
 
In the Eyesay for inspection, investigation, data measurement duties
It recruits the staff concerned.

News from Eyesay

About our approach in the new coronavirus infection prevention
2020-03-02
About our approach in the new coronavirus infection prevention
We carry it out as an infection preventive approach of the new coronavirus as follows.
 
①Time expansion of the staggered office hours
 : I extend attendance time from 7:00 to 13:00 and cope with the temporary closure of a school of off peak attendance and the child.
②Health care of the employee
 : When the infection of a layoff, the person and the family is accepted, temperature 37.5 degrees or more perform the measures of the stop going to work. In addition, of the hygiene management
  I utilize hand-washing, mask wearing, prevention, infrared instrument of the infection spread by the ventilation in the company as enforcement and carry out the temperature measurement each time.
③Seminar, correspondence to a meeting
 : I cancel a meeting in the company, holding of the class in principle and postpone it. I decide to wait about a meeting, class outside the company, the participation in event as much as possible.
  I take infectious disease measures enough out of necessity when I hold it.
④While assuming it restrictive measures until Thursday, March 19, but launching an infectious disease task force, and taking example by the office by social conditions; during advancement and the period of the correspondence extend it.
 
The customer will cause you serious inconvenience by our measures, but I would like understanding and cooperation.
Eyesay
<head office>
〒116-0013
2-40-3, Nishinippori, Arakawa-ku, Tokyo
The sixth floor of the Yokoyama Building
TEL: 03-6806-7281
FAX: 03-6806-5717
※We moved from September, 2018
-- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
●Measurement examination of the structure
●Inspection of the structure
●Investigation, diagnosis of the structure
●3D measurement
○Sale of the Three-dimensional measurement machine
-- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Back to TOP